| Chapter No. | Chapter Title | Chapter Author | Page No. |
| KEYNOTE LECTURES | | |
| Rohtang Tunnel Himachal Pradesh | V.K. Yadav | 3 |
| Rock Mass Parameters for Analysis and Design | T. Ramamurthy | 8 |
| Contract Management of Underground Construction Works | D.P. Goyal | 27 |
| Contract Management- A Key Area in Underground Construction | K.K. Gupta | 36 |
| Tunnels and cavern Construction Technologies and Equipments | R.D. Varangaonkar | 37 |
| Risks Assessment and Management for Underground Works | Jitendra Chaubey | 50 |
| Ventilation of Long Large Size Tunnels & Caverns | R.K. Khanna | 60 |
| DESIGN OF TUNNELS AND UNDERGROUND WORKS | | |
| Design & Construction of 38m Dia Surge Shaft & Multijunction (Rampur Hydro Electric Project--412MW) | R.N. Mishra, Deepak Nakhasi, R.K. Sharma and Mukesh Sharma | 73 |
| Design of Support System for Large Underground Power House Complex- A case Study | Jitendra Chaubey and Naveen Bahuguna | 82 |
| Challenges faced in Design and Construction of HRT in Adverse Geological Conditions at (412 MW) Rampur Hydro-Electric Project | R.N. Misra, Deepak Makhasi, R.K. Sharma and Rakesh Sehgal | 88 |
| TUNNEL & CAVERN CONSTRUCTION, TECHNOLOGIES AND EQUIPMENT | | |
| Construction of Large Dia Surge Shaft in Soft Strata of Himalayan Geology in Rampur HE Project: A case Study | K.C. Mahalik | 101 |
| Experience of Tunneling by NATM at Teesta VI (500MW) H.E. Project Sikkim | B.K. Sharda, B.K. Ojha | 118 |
| Construction of PIR Tunnel by NATM Method | Vinod Kumar | 131 |
| Tunneling through Thrust Zone and Hot Water Zone in Rampur Hydro Electric Project (412MW) in Himachal Pradesh, India | R.N. Misra, Kranti Kumar Gupta, Anil Goyal, R.K. Chauhan | 147 |
| Geo-Technical Problems Encountered and Remedial Measures Undertaken in Excavation of Head Race Tunnel of Kameng Hydro Electric Project (600MW), Arunachal Pradesh | Ranendra Sarama | 162 |
| Problem faced and Remedial Action taken in Construction of Tunnels on USBRL Project of Northern Railway | Sunil Bhaskar and Brijbhan | 173 |
| Durability Issue for SFRC Precast Segment in Tunnelling Application | Benoit de Rivaz | 185 |
| Excavation of Adit in the Vicinity of Close inhabitance in Rampur Hydroelectric Project Head Race Tunnel--A case Study | Kranti Kumar Gupta, Anil Goyal , Arun Dhiman and R.K. Chauhan | 195 |
| Blasting Productivity Improvement with Increased Pull at Head Race Tunnel of Lohari-Nag Pala Hydroelectric Power Project, Uttarakhand | M. Ramulu and T.G. Sitharam | 203 |
| HRT River Crossing of Rampur H E Project Below Satluj in Low Cover Zone--Tunneling Beneath the River bed at HRT River in Low cover Zone using drilling and blasting methodology | JKranti Kumar Gupta, Anil Goyal, Vijay Thakur | 215 |
| Rock Supports for head Race Tunnel | Hari Dev abd Rajbal Singh | 228 |
| A Tunnel: Panam High Level canal | K.L. Dave and Man Mohan Singh | 240 |
| URBAN TUNNELLING | | |
| Construction of line 2 Tunnel of Delhi metro with Shield TBMs | jitendra Tyagi and Sanjeev malik | 251 |
| Challenges in Cut and Cover Tuneling in urban Environment | Deepak P. Gurav | 260 |
| Fundamental Principles of DMRC Safety Management system (SMS) for Safety during Tunnel Construction Works | Devendra Gill | 269 |
| Technical Challenges faced in Tunneling through central Ridge Area of Delhi metro Airport Link | Ravi kapoor, Nashith Gupta and Satish Suneja | 277 |
| RISK MANAGEMENT AND ENVIRONEMNTAL & SOCIAL ISSUES | | |
| A Holistic Assessment of Risk Impact in Rampur and Sawarakuddu underground project in H.P. | K.C.Mahalik | 295 |
| Environmental and Social aspects of Underground Works in Hydropower and Mitigation Measures | A.K. Sarkar abnd Shahid Ali Khan | 307 |
| DMRC and Clean Development Mechanism | S.A. Verma | 315 |
| INNOVATIVE TECHNIQUES | | |
| Elastomer Rubber Gaskets for Segmental Liners | Werner Grabe | 325 |